"The Mill" Biomass Installation

"The Mill" Biomass Installation

"The Mill"

Kings Coughton

Warwickshire

Biomass Installation

Known locally as 'The Mill', this is one of our first Biomass projects in the South West. M-Press Carbon Steel fittings and tube were chosen for part of the project. The install was completed by Treco, one of the country's leading installers of biomass heating systems. Treco are based in Tiverton, Devon and over the past 10 years have built an impressive portfolio of biomass and district heating installations from small private projects to large commercial jobs.

 

The Mill is owned by Greenmech Ltd who design and manufacture wood chippers and green waste shredders. M-Press was used in sizes 108mm down to 28mm which provided the Treco engineers with a safe, flame free working environment and a time saving install. M-Press Carbon Steel is a 16bar rated system with a peak temperature range of 120degrees - the ideal solution for biomass. The M-Press Carbon Steel system carries one of the longest Carbon Steel guarantees of it's kind.